Skip to main content
Organize and collaborate

Use versions, forks, undo, and editor copies

Preview earlier renders, restore or fork saved conversation checkpoints, and use undo or redo where available.

Written By Anish Muppalaneni

Last updated 6 days ago

Read before this

  1. Find and manage old projects, videos, chat history, and Tool results
  2. Revise a generated video

A rendered output and a saved conversation checkpoint are different. Preview or download an earlier render without changing the project. Use Saved versions to restore a checkpoint or fork it when you want another direction.

Before changing saved work

Open the project from Projects and confirm that you own the conversation you intend to change. Wait for active work to finish. Keep its URL and use a separate name for any fork so you can find both directions later.

Preview an earlier render

  1. Open the conversation containing the video.
  2. Open Versions when more than one rendered output is available.
  3. Select an output and play it.
  4. Choose Download on a paid plan if you want a file of that output. Selecting it does not restore the editable project.

To continue from an earlier checkpoint, open Saved versions in a conversation you own. Restore a checkpoint to make it the active project state, or fork one to keep a separate path. Eligible message actions also offer undo or redo. Confirm the active version before requesting another generation, which can use credits.

Restore or fork a saved version

  1. Open your conversation from Projects and wait for any active work to finish.
  2. Open Saved versions and choose the checkpoint you want.
  3. Choose Restore to continue from that checkpoint, or Fork to create a separate direction.
  4. Check the active conversation and replay the result before sending another revision.

Undo or redo a conversation turn

Eligible messages offer undo or redo actions. Read the action and confirm the intended checkpoint before continuing. Use Fork from Saved versions when you want a separate direction, and check which conversation is active before requesting another generation.

Continue older or separately saved work

Open the intended project from Projects before making a change. If you imported or separately saved an older project, check its name and preview; do not assume edits to another conversation automatically appear in it.

If an earlier result is missing

Confirm you opened the original conversation and that it has more than one generated output. Keep the conversation link when contacting Support so they can identify the work.

Contact Support when work is missing

Stop undoing, forking, or regenerating when an expected render or checkpoint is missing. Keep every related project and send Support the original project URL, approximate time, last visible version or error, and names of any separately saved projects. Recovery is not guaranteed.

Versions and copies FAQ

Can I restore an earlier project state?

Yes. In a conversation you own, open Saved versions and choose Restore on an eligible checkpoint. This differs from Versions, which previews or downloads rendered outputs without restoring the editable project.

Why can’t I see an earlier rendered output?

Confirm that you opened the intended conversation and that it has more than one completed output. Check Versions for renders and Saved versions for project checkpoints. Contact Support if an expected result is still missing.

How do I download an older render without changing current work?

Open Versions, select the earlier output, and preview it before downloading on a paid plan. Selecting or downloading it does not restore a project checkpoint.

How do I keep two creative directions?

Open Saved versions and choose Fork on the checkpoint you want to explore. Check the newly opened conversation before revising it, and name the projects so the original and fork are easy to distinguish.

What should I check after restoring or forking?

Confirm the active conversation, plan, and preview before requesting more work. A new generation or revision can use credits. Keep the project URL if the state does not match the checkpoint you selected.

Keep going

Continue in ngram

Open the relevant Studio surface and follow the current controls shown in your account.

Open Projects


Read this guide in Markdown